share this post
on this page
Business electrification rarely starts with a grand plan. It starts with a few chargers for the vans, a heat pump replacing the gas boiler or solar panels on the roof of the new warehouse. Then the next asset arrives, and the one after that. Somewhere along the way you notice that your grid connection has a say in every decision. Which step makes sense now depends on the phase your business is in.
Electrification has no finish line. Every step shifts your peak, and that peak decides what your next step will be.
- In the Netherlands, more than 15,000 large consumers were waiting for a new or bigger grid connection at the end of 2025. In Germany, manufacturers report waits of up to ten years. A grid upgrade is rarely a quick route.
- Electrification runs through three phases: planning, first assets and growth. Each phase raises its own questions and has its own next step.
- In the planning phase, you check upfront whether your plan fits. That is how Enexis opened a new distribution centre on 74 kW of contracted capacity.
- Once your first assets are running, you need to know where your peak sits. A fire station in Zeist cut its gas use by 90% without a bigger connection.
- In the growth phase, you control every asset and site automatically. Montea started on six sites and chose to roll out to 25 sites in the Netherlands.
If you know where you stand, you never have to start over at the next step.
Why electrification never stops at one step
The push to electrify comes from several directions. Transport has to get cleaner: under the EU CO2 standards for new trucks, manufacturers must cut average emissions from new heavy trucks by 45% from 2030. Buildings are moving off gas, and production processes are switching to electric heating and cooling. Each of those steps needs power.
Your grid connection does not grow with you. The Netherlands, where grid congestion hit first, had more than 15,000 large consumers in the queue for a new or bigger connection at the end of 2025. Germany is following: a study published in June 2026 cites manufacturers waiting up to ten years for a grid connection for their electrification projects.
The problem is rarely how much energy you use in a year. It is how much you use at once. Many connections only hit their limit a few hours a month, for instance when the vans all plug in at the end of the day while the refrigeration is still running flat out. On paper, the connection is full. In practice, there is spare room for most of the day.
Every new asset changes that peak. A fast charger adds a block on top, a battery can take part of it away, and solar panels shift the moment it falls. That is why electrification is a series of decisions, and those decisions get easier once you know which phase you are in.
The three phases of electrification: where do you stand?
Most businesses are still at the start of their electrification. Even so, the questions look very different from one phase to the next. These signs help you place your own situation:
Torn between two phases? Look at the next decision on the table. It says more about your phase than the number of assets already running.

Phase 1: you have a plan, but do not yet know if it fits
The planning phase revolves around three questions. What is possible within my connection? Does the plan my installer proposes actually fit? And what does electrifying cost, including the items that are not on the quote yet? If you guess here, you find out the answer when the chargers are already on the wall.
What good looks like in this phase: a plan that has proven itself before you spend a euro on it. An energy simulation shows how consumption, generation, storage and charging interact, quarter-hour by quarter-hour. You see where the peak falls, how much headroom you have left and which battery, if any, belongs in the picture. Simulate, part of Tibo EMS, does this using your own consumption profile and connection. Often your installer runs the simulation as part of the proposal.
Enexis, a Dutch grid operator, shows how this plays out. Its new distribution centre and maintenance workshop in Best had a 1,750 kVA connection but only 74 kW of contracted capacity. Requesting more was not an option, because the grid operator itself was in the queue. Installation partner Eigenenergie.net used Tibo’s software to model different combinations of solar panels, batteries, heat pumps and chargers. Based on those scenarios, solar panels went on the roof and two batteries were placed on site.
There is a second lesson in this case. The switchboard was built heavier than needed and extra cable ducts were laid, so Enexis can later double its solar and battery capacity and add chargers. Thinking about the next phase while you plan saves you from tearing things out again in a few years. To find out how much growth fits within your connection, read our blog on expanding without a grid upgrade.
Signal for the next phase: the plan has been modelled, the investment is approved and the installer is starting work. Our blog from simulation to a working system explains how a modelled plan becomes a working installation.
Phase 2: your first assets are running and the peak is getting closer
Once the first assets are running, you want to know what happens every day. Many businesses notice two things in this phase: they occasionally hit the limit of their connection, and they have no clear view of when or why that happens.
The first step is visibility of your peak. Your meter records consumption every quarter-hour, and your metering company or grid operator can share that data. Put those quarter-hour values next to your contracted capacity and you see how often you get close, at what times and which combination of assets causes it. This is also the moment to look into what exceeding your contracted capacity costs, because the bill is often higher than expected.
If your peak regularly comes close to the limit, manual adjustments stop being a workable answer. Assets start getting in each other’s way: the chargers draw full power just as a cloud passes over the solar panels. Our blog on when solar panels, EV chargers and a battery start working against each other explains how that happens. Automatic control is the logical next step.
The fire station in Zeist, in the Netherlands, shows what is possible in this phase. The station had to come off gas, but its connection could not be upgraded and feeding power back into the grid was not allowed. Unica replaced the cooling machine with a heat pump, added three heat pumps for heating and installed solar panels and a 100 kWh battery. An energy management system from Tibo aligns generation, storage and consumption within the limits of the connection. The result: 90% less gas, while the station stays ready for call-outs around the clock.
Signal for the next phase: a battery is on the roadmap, a second site is coming or you are considering a dynamic energy contract.

Generated with AI
Phase 3: more assets, more sites and too little time
In the growth phase, energy mostly costs time. Someone has to manage charging schedules, set up the battery, follow energy prices and keep track of what happens at each site. Usually that person does energy on top of their actual job, and the task grows with every new asset and site.
What good looks like in this phase: you set the goal and the system runs the rest. With Control, part of Tibo EMS, all your assets are controlled automatically. The system recalculates every five minutes and plans 48 hours ahead, based on your consumption, the weather forecast and energy prices. It keeps you within your connection and uses the battery when it pays off most.
What matters in this phase is that you do not start over. Simulate and Control work on the same model of your site. The plan you modelled during the planning phase becomes the configuration the system runs on. When an asset or site is added, you extend the model and the system takes it into account. You stay in charge of every investment.
Montea, a listed owner of logistics property in Belgium, the Netherlands, France and Germany, is clearly in this phase. On six sites in Belgium, Tibo EMS controls solar panels, batteries and the consumption of distribution centres, including trading on the dynamic energy market. Building on that experience, Montea chose to roll the system out to 25 sites in the Netherlands. One system across every site makes that step smaller.
Signal that you can go further: your connection has headroom you are not using, or a new site is on the roadmap. The cycle starts again, but this time you already know what works.
These moments call for a decision
Phases blur into each other. Often it is a specific event that forces the next step. If you recognise one of these moments, it is time to look at your situation again:
What plays a role in every phase
Some concerns do not belong to a single phase. Energy costs rise, prices fluctuate and customers, investors and regulators expect lower emissions. You feel that pressure in the planning phase just as much as in the growth phase.
The difference is what you can do about it. In the planning phase, you choose assets that lower costs and emissions for good. With your first assets, you bring down your peak costs. In the growth phase, you shift consumption to the cheapest and cleanest hours.
Know your phase, but not yet what the next step delivers?
Your phase tells you which question matters now. The answer depends on your connection, your assets and your plans. Tibo EMS runs at more than 100 customers. On average, their energy costs fall by 20%, and they get up to 7x more use out of their existing connection, without a grid upgrade. Curious what that means for your phase? Book a demo, and we will look at your current situation and the step that comes next.
Frequently asked questions
follow us
Don't miss the next spark.
Subscribe and catch the latest in energy management.




