You’ve run three scenarios with your client. The one with solar and a battery fits within the grid connection, the peak from the new production line is covered and the client has said yes. The report is in their inbox.
This is where projects tend to lose momentum. The plan has to become a quote, the quote an installation, and the installation a system that does every day what you calculated. If simulation and control run in two separate programs, you end up building the energy system twice: once in your calculation model and once in the control layer.
At Tibo, it’s one model. The simulation you built is the basis on which the EMS is configured. Below: what carries over from that model into the EMS installation, what changes along the way and what happens once your work on site is finished.
The simulation isn’t a standalone feasibility study. It’s the first version of the system that will run your client’s site.
- The model from the simulation, with its assets, grid connection and contracted capacity, is the basis for configuring the EMS. Nothing gets rebuilt.
- What changes: historical data gives way to live measurements, and modelled assets become specific makes and models.
- An asset without an existing driver adds 6 to 8 weeks to the lead time. Check this during the simulation.
- After the Site Acceptance Test, the system calculates a new control schedule for each asset every 5 minutes, with a setpoint per quarter-hour.
- The forecasting models are trained at the start, after one week and after one month. Then you receive the Implementation Acceptance Report.
The calculations are done. What’s left is connecting, testing and letting it run.
What carries over from your simulation
In the simulation, you rebuilt the site as a digital twin: the grid connection with its physical limit and contracted capacity, the assets already there or still to come, and the consumption profile. You ran scenarios on that model and chose which combination of solar, storage and charge points fits within the limits.
That model doesn’t disappear into a report afterwards. The validated model is the starting point for configuring Tibo EMS. In the simulation, the software calculates ahead using historical data. In the EMS, the same software does that with what is actually happening on site.
For your client, that has a practical upside. The decision they made based on the simulation doesn’t need to be translated again by another party with a different calculation model. The control logic they saw in the scenario is the logic that will run on their site.

What changes when the model meets reality
Same model doesn’t mean nothing changes. Three things do, and together they determine how smoothly the handover goes.
What you can sort out during the simulation
Most delays between simulation and control happen in the weeks before installation. A few things are worth settling straight away, while the scenarios are still on the table.
Start with the assets. The exact battery, inverter or charge point is often only fixed once the simulation is done. Check right then whether the model is among the supported integrations. If it isn’t listed, that’s not a no yet: we do the final check. If a driver needs to be developed, we’ll need a Modbus register list for the asset and you should allow 6 to 8 extra weeks. The earlier you know, the less it affects your schedule.
Then pin down the grid connection. For the quote, we need the physical limit of the main connection, in kVA, kW or A, and the contracted capacity for both import and export. You already gathered this for the simulation. A single-line diagram showing both power and data lines isn’t mandatory, but it shows at a glance which gateway type fits.
Finally, decide on phasing. Will all assets go live at once, or the solar panels first and the battery later? Every phase that requires different local control rules needs its own Site Acceptance Test (SAT), and each SAT is invoiced separately. Settle this during the simulation and it will be right in the quote as well.
From quote to handover
After the simulation, the EMS installation runs in four phases: registration and quote, onboarding, installation and connecting the assets, and local control rules with the SAT. For the pitfalls that most often slow a project down, see the top 5 risks in EMS implementation. Here is the outline.
Once the quote is signed, you’re assigned an Implementation Specialist. They collect the details for each asset, such as make, model, power and communication method, and they’re your point of contact during installation. We supply the gateway, you install it and connect the assets. Anything that doesn’t communicate at this stage can’t be controlled later either.
Next, we configure the local limits on the gateway remotely. These rules guard the contracted capacity of the connection, even without a cloud connection. The SAT then tests whether every asset can be read and controlled. Once that test passes, your work on site is done.

The first month: the model gets to know the site
This is the part you don’t see in the simulation. After the SAT, we link the gateway to an EMS site in the Tibo portal. We set up the digital representation of the installation, and the system starts sending setpoints to the gateway. Every 5 minutes, a new control schedule follows for each asset, with a setpoint per quarter-hour.
From that point, it works with real measurements rather than last year’s consumption. We train the forecasting models at the start, again after one week and once more after one month. Each round sharpens the forecast, and we adjust parameters where needed. Throughout the first month, we actively monitor the site.
After that month, you receive the Implementation Acceptance Report: confirmation that the implementation has been tested and the system is running as intended. The project then moves to Customer Success, your point of contact for improvements and next steps. For faults and technical questions, you can contact support.
And if reality differs from the simulation?
Your client will ask this, and it’s a fair question. A simulation is a well-founded expectation based on historical data. Next year’s weather will be different, a new machine will run different hours, a charging schedule will shift. Nobody can offer guarantees, and neither can we.
What you can explain is how the system handles deviations. The EMS recalculates every 5 minutes based on the current situation. If consumption departs from the expected profile, it controls based on what is actually happening, within the limits set on the gateway. The simulation fixes the boundaries and the control logic. The decisions for each quarter-hour come from live data.
How it went at Van Ommen
Van Ommen, a metalworking specialist in Beekbergen in the Netherlands, wanted to build a new production hall. Its contracted capacity was fully used, and so was grid capacity in the area. Together with Hollander Techniek, the new situation was first modelled in a digital twin.
“We mapped out what the client needed, linked the required capacity to it and put that information into the software,” says Bastian Hoonhorst, adviser at Hollander Techniek.
The model showed that the current profile plus the new consumption produced a peak too high for the grid contract. Solar panels solved that in summer, but left a shortfall for the rest of the year. Only with a battery, supplied by Hollander Techniek, could the winter peaks be absorbed as well, including those from the new spot welding line. That scenario went live. The predictive control of Tibo EMS now manages the battery, and Van Ommen can keep growing at its existing site.

Adding an asset later
Sites change. A charging hub gets added, or a second battery. You don’t have to start over. You add the asset to the same model, run the new scenario and see whether it fits within the connection. It’s a small extra step with associated costs. The model is already there.
On site, the route is the same as the first handover, on a smaller scale: connect the asset and, if it requires different local control rules, carry out a new SAT. A battery, for example, needs different rules from solar panels.
Plantline shows how a site can grow in stages. The plant exporter first ran on a 55 kW construction connection, with battery storage from Ecopowercell absorbing the peaks. Later, the solar panels were added and control shifted to charging during the cheaper hours and discharging during the expensive ones.
The calculations are already done
With a completed simulation, you’ve already prepared a large part of the EMS installation. You know what’s on site, what the connection can handle and which scenario your client has chosen. What follows is execution, based on the same model.
Not yet working with Tibo as a partner? In a demo, we’ll show you how a simulation becomes the EMS configuration, using one of your own sites as the example.
Frequently asked questions
follow us
Don't miss the next spark.
Subscribe and catch the latest in energy management.