The quote for a battery or a charging depot is on the table, and your installer recommends requesting an energy simulation first. To do that, you supply four things: a year of quarter-hourly data from your grid connection, your contracted capacity and energy contract, an overview of your existing assets, and your plans.

With that data, the installer or Tibo Energy builds a digital model of your site. The model then runs through every quarter-hour of the year twice: once as the site runs today and once with your plan added. The difference between the two answers your question.

In brief

An energy simulation is only as good as the data that goes into it, and that data is usually already sitting with whoever meters your connection.

  • For an energy simulation you supply quarter-hourly data, ideally covering a full year, plus your contracted capacity, your energy contract, your existing assets and your plans.
  • Quarter-hourly data for a large business connection comes from the company that meters it, requested with the connection’s identifier.
  • For a new build with no metering history yet, the installer creates an expected consumption profile from the machines, chargers and installations that are planned.
  • The simulation runs at 15-minute resolution and compares your current situation with one or more scenarios on cost, CO2, peak demand and feasibility.
  • At truck dealer LVS, Elektropartners loaded the quarter-hourly data and the expected charging demand into the simulation and used it to size the battery storage needed to charge electric trucks within the existing connection.

The sooner your data is complete, the sooner you have an answer.

What data do you need for an energy simulation?

An energy simulation needs data on your current consumption, the limit of your grid connection and your plans. In practice, that comes down to six items:

  • Quarter-hourly data from your connection. Consumption per quarter-hour, plus export if you have solar panels, ideally over a full year. That way a cold week in January and a sunny afternoon in June both end up in the calculation.
  • Your contracted capacity and the physical limit of your connection. Your contracted capacity in kW and the physical size of the connection. If your contract allows more or less capacity at certain times of day, include the time windows and the capacity for each one.

  • Your energy contract. Fixed or dynamic, with the tariff structure. It determines when shifting consumption saves money.
  • Your existing assets. Solar in kWp, chargers, a battery, a heat pump or refrigeration, each with its rated power.
  • Your plans. What you want to add, even if it is still rough: an extra production line, a new hall or the number of electric trucks you are ordering.
  • For chargers: charging behaviour. How many vehicles, how many kWh per session, when they arrive and when they need to leave again. A truck that departs at six in the morning needs a different charging schedule from one that stands idle all weekend.

Rough assumptions are fine for a first run. Write them down, though, so you can sharpen them in the next round and everyone knows what the result is based on.

Dashboard met simulatieresultaten van een digital twin voor een logistiek depot

Generated with AI

Where do you get your quarter-hourly data?

You get your quarter-hourly data from the company that meters your connection. In the Netherlands, every large business connection has a certified metering company that records consumption per quarter-hour, chosen by the business itself; elsewhere this role often sits with the grid operator or a metering service provider. Dutch grid operator Liander points out in its brochure on grid capacity shortages (July 2023) that customers can look up their metering company in the Mijn Liander portal.

To request the data, you need the unique identifier of your connection, which appears on your energy bills. In the Netherlands, that is the 18-digit EAN code. If your installer collects the data for you, you arrange that with a letter of authorisation for that connection.

Check the file before you send it on. Look at whether it contains kW or kWh per quarter-hour, and how decimals and thousands are written. Many European systems export with a decimal comma, and a file read with the wrong settings turns 1,250 kW into 1.25 kW. The result is a simulation of a very different business from yours.

What if you have no metering data yet, for example with a new build?

Without metering data, an energy simulation works with an expected consumption profile. Quarter-hourly data only exists for a connection that is already in use. For a new site, the installer therefore builds the profile from what is coming: which machines, chargers and installations, at what times they run and how much power they draw. In the model, that is done with daily patterns for each load.

For an extension to an existing site, the simulation combines both. Measured quarter-hourly data for what is already there forms the base, with the expected loads of the new hall, the extra line or the charging depot added on top.

An estimated profile has one limitation: it is less likely to anticipate an exceptional peak than a year of measured data, because nobody writes such a peak down in advance. So build in some margin, and rerun the simulation once the first months of metering data from the new site are in.

How does an energy simulation work, step by step?

An energy simulation follows five steps, from the question you want answered to the conversation about the result.

  • 1

    Pin down the question. Decide which decision depends on the outcome: whether a fleet of twenty electric trucks fits within the connection, which battery is enough, or whether the new hall can be added. The more specific the question, the more focused the scenarios.

  • 2
    Supply the data. Quarter-hourly data, contract, assets and plans. This is often the step that takes longest.
  • 3
    Build the model. Your site becomes a digital twin: connection, contracts, assets and loads, with the limits that apply to each.
  • 4
    Run the scenarios. Your current situation and one or more variants of your plan, for every quarter-hour of the year. Often several battery sizes or charging schedules are compared side by side.
  • 5
    Discuss the result. What fits and what does not, and which set-up can be the smallest without exceeding your limit.

How long the whole process takes depends mainly on how quickly the data is complete and how complex the site is. An office with solar panels is simulated faster than a depot with dozens of charging sessions a night.

Most simulations run through an installation partner. The partner models your project in Tibo’s simulation software and draws up a proposal based on the result. If you come to Tibo Energy directly, we bring in an installer, because the design from the simulation also has to be built.

How it worked at LVS

LVS, a Volvo Trucks and Renault Trucks dealer in Broek op Langedijk in the Netherlands, needed DC fast chargers for the growing number of electric trucks in sales and service. Its contracted capacity was enough for day-to-day operations, but not for charging trucks.

Elektropartners loaded the site’s existing quarter-hourly data into the simulation, together with the expected charging demand. Dennis Koopmans, Project Manager at Elektropartners: “We loaded the existing quarter-hourly data into Tibo’s simulation and determined the expected charging demand. Based on those outcomes, we could determine exactly how much battery storage was needed.”

Based on that outcome, Elektropartners installed 125 kWp of solar, two battery systems and two 60 kW DC fast chargers. Tibo EMS keeps the whole system within the limit of the connection, and LVS now charges electric trucks on site without upgrading its grid connection. Read the full story in the LVS case study.

LVS, official Volvo Trucks and Renault Trucks dealer.

What do you get back from an energy simulation?

You get back a comparison: your current situation next to the scenario with your plan. Tibo’s energy simulation assesses each scenario on cost, CO2, peak demand and feasibility.

For every quarter-hour you can see whether and by how much your consumption exceeds your contracted capacity, how high the peak on your connection gets and what the difference is worth per year. Run several variants and you also see the point beyond which extra capacity adds nothing. Sometimes a smaller battery turns out to be enough than the one in the quote, which cuts your investment straight away.

How to turn that comparison into a payback period is covered in Energy simulation: how to know upfront whether your investment pays off.

What happens to the simulation if you go ahead?

If you go ahead, the model from the simulation becomes the configuration for live control. Your site does not need to be modelled again: the same connection, contracts and assets carry over to Tibo EMS, which recalculates every five minutes and plans 48 hours ahead. Tibo EMS makes solar, chargers and battery work together within the limit of your connection. We call that Energy Orchestration.

If another asset follows later, a second battery or ten more chargers, you add it to the same model and run the numbers before you buy anything. Start small, never start over. What the move from simulation to installation involves is covered in Your simulation is done. Here’s how it becomes a working EMS.

Is there already a plan or a quote on the table?

A simulation is worth most before the order is placed, while there is still something to choose. If you are an installer or energy consultant and want to run simulations for your own clients, our partner page is the place to start.

In a demo, we show you what a simulation looks like, from the quarter-hourly data you supply to the comparison of scenarios. Feel free to bring your own question, whether it is about a fleet, a new hall or a battery.

Frequently asked questions

Ideally twelve months. A full year contains both the winter peaks and the sunny summer days, and together they determine how large a battery or how generous a charging schedule needs to be. Less data gives you a first impression, but the calculation then misses part of the seasons.

Yes. If your contract allows more capacity at certain hours, at night for example, you enter the time windows and the available capacity for each one. The simulation then shows for each window whether your plan stays within the limit.

Yes. The simulation works with both fixed and dynamic tariffs, so you can see what it is worth to shift consumption to cheaper hours. You can also use it to compare what switching to a dynamic contract would mean for your site.

Yes. A rough plan is enough for a first run, for example ten or twenty electric trucks. Simulating both variants shows you where the limit of your connection lies, and which step you can take first.

Yes, your data stays yours. Tibo Energy is ISO 27001:2022 certified and hosts the data in the EU. You can request the security documentation in the Trust Center.

follow us

Don't miss the next spark.

Subscribe and catch the latest in energy management.